Case Studies

Explore how HPM Consultants brings clarity to complex scheduling,delay and damages disputes.

Premier Luxury Apartment Towers

The Challenge

A significant loss event occurred during the construction of a 42-story luxury high-rise residential tower in Los Angeles, resulting in extensive property damage and several months of project delay. The incident gave rise to both a Builder’s Risk and Delay in Start-Up (DSU) insurance claim. The parties were unable to reach agreement on the extent to which the loss event affected the project schedule and ultimate completion date, leading to litigation in federal court.

Our Services

The loss event disrupted the work of multiple trades and subcontractors, requiring extensive resequencing, recovery planning, and schedule acceleration efforts to mitigate the resulting delays. HPM Consultants was retained to evaluate the schedule impacts and prepare an independent expert opinion regarding the delay attributable to the loss event.

Our analysis included a comprehensive review of the contemporaneous project records, construction schedules, correspondence, and other project documentation to determine the most appropriate forensic schedule analysis methodology. Given the insurance coverage issues, the assignment required careful consideration of both scheduling principles and insurance claim requirements. Multiple recognized forensic delay analysis methodologies were applied, and the findings were presented in a clear, logical, and accessible manner for counsel and the court.

Outcome

The appropriate delay analysis methodology became a central issue in the litigation, with the opposing expert relying on a substantially different analytical approach. Following briefing on a motion for summary judgment, the federal court accepted our methodology over that advanced by the opposing expert. Our rigorous analysis, grounded in industry best practices and supported by the contemporaneous project record, provided a strong technical foundation that significantly advanced our client’s position in the litigation.

NEWS

recent from Our Blog

13 Interrelated Factors HKA found an average of 13 causation factors per project, highlighting how closely connected schedule and cost issues can become. 1. Correct Logic Activities are properly connected, allowing the schedule to flow as planned and reflect the intended sequence of work. 2. Broken Link One incorrect or missing relationship can create a […]

Independent analysis benefits construction disputes across California

When a construction dispute reaches the point of formal claims, the quality of the delay analysis behind it often determines whether the outcome holds up under scrutiny. A delay damages expert witness in San Diego who has no financial stake in the outcome brings a level of objectivity that internal staff, however capable, simply cannot offer. […]