Dr Hendrik Prinsloo is an expert witness and specialist in the analysis construction delay claims

Table of Contents

5 Critical Questions Every Project Manager Should Ask

A construction schedule is more than a project management tool. When delays, disruptions, or disputes arise, it can become a critical piece of evidence in determining what happened, why it happened, and who may be responsible.

A schedule that looks complete on paper may still contain weaknesses that undermine its credibility during a claim or dispute.

Here are five essential questions to help evaluate whether your project schedule can withstand scrutiny.

1. Are the Logic Ties Complete?

Every activity should be connected logically from start to finish. Missing links, unrealistic sequencing, or incomplete relationships can weaken the credibility of the entire schedule.

2. Are Constraints Hiding the Real Critical Path?

Excessive hard constraints, negative lag, or unexplained float changes can distort the critical path and make delay analysis more difficult.

3. Can Every Major Change Be Explained?

Significant schedule revisions should be supported by documented reasons and tied to actual project events, rather than unexplained changes between updates.

4. Is the Baseline Still Meaningful?

A reliable baseline helps establish how the project was originally planned and provides a reference for evaluating delays, changes in the critical path, and subsequent revisions.

5. Does the Schedule Match the Project Record?

Schedule updates should align with daily reports, correspondence, change orders, progress records, and other contemporaneous documentation.

Red Flags That Can Undermine Your Schedule

Watch for missing logic links, excessive hard constraints, negative lag values, irregular updates, unexplained baseline changes, and gaps between schedule dates and project records.

The bottom line: A defensible construction schedule requires more than accurate dates. It needs sound logic, consistent updates, transparent revisions, and supporting documentation.

At HPM Consultants, we help identify schedule weaknesses before they become costly claims.

Protect your project. Strengthen your schedule. Be prepared for scrutiny.

Visit teamhp m.com (teamhpm.com) to learn more about construction scheduling and project support.

 

Construction Schedule